live · Smart factory

For the plant manager who reads machine states off a clipboard.

It reads your machines. It never writes.

Every machine on the floor read in its own protocol, into the same twin, alarms and work orders as everything else you run.

Line 1 · its twinlive
OEE this shift
41.9% · A 42.9 · P 100 · Q 97.8
Stopped
4min · CELL-4 Machining Cell · technical / Spindle drive fault
Bearing
0.28mm/s RMS · CNC-1 Mill · a reading, not yet judged

RuleEvery state from the machine’s own protocol; OEE as A × P × Q with its time elements shown; nothing written back.

  • 00:38:52Reason entered by the operator · on the phone
  • starvedPRESS-5 Press · derived from the line’s flow
  • refused4 write attempts · each refused by the factory program
What the twin holds: state · stops and reasons · OEE · energy · vibration · historydemo run
1The problems

In the operator’s words.

the plant manager, at the shift meeting
“A machine stopped and nobody wrote down why.”

Today: a reason sheet on a clipboard — typed up after the shift.

A stop longer than your threshold asks the operator for its reason on the phone, offline if it must. Seven top-level reasons no site can edit, and the sub-reasons you own. “Unknown” is counted, never buried: reason coverage is a figure on every shift.

Outcome Every lost minute has a reason, or is counted as having none.
Phone · the stop
CELL-4 Machining Cell’s stop on the phone’s Floor tab, still going, with the seven reasons to choose from and none given yet.
From a demo run: CELL-4 Machining Cell’s stop on the phone, still going, with the reasons to choose from — none given yet.
the production engineer
“Our OEE is a spreadsheet nobody trusts.”

Today: an OEE tool — its own sensors, its own cloud.

Availability × Performance × Quality per machine per shift, rolled up to line, area and factory, with the time elements shown: planned time, planned and unplanned stops, operating time, produced, good, scrap. A standard that’s too slow is capped and reported. Quality is measured only where something counts the rejects; otherwise the shift says so, and never shows 100 %.

Outcome The figure and its parts, from the machines’ own counts.
Machine · OEE this shift
CELL-4 Machining Cell’s OEE for the shift the scenario ran: availability, performance and quality, the OEE as their product, a factor without a source saying not measured, with the time elements and counts behind them.
From a demo run: CELL-4 Machining Cell’s OEE for the shift: availability, performance and quality, with the time elements and counts behind them.
the line supervisor
“One machine stops and the whole line looks broken.”

Today: a maintenance system — stops retyped as tickets.

Starved and blocked are derived from the line’s flow and the buffers between machines, and labelled derived. A neighbour’s pause shorter than the machine’s own cycle changes nothing.

Outcome The stop is the alarm; the machines waiting on it are named under it.
Line 1 · the floor↓
Line 1 on the Floor during CELL-4’s stop: CNC-1 and CNC-2 producing, PKG-3 Flow Wrapper blocked and marked derived, CELL-4 Machining Cell down unplanned, PRESS-5 Press idle.
From a demo run: Line 1 on the floor during CELL-4’s stop: each machine’s state, PKG-3 marked blocked and derived.
the plant’s IT and security lead
“Nothing goes on the control network that can write to a PLC.”

Today: each machine-builder’s portal — one login per maker.

The factory program on your plant network is built from the read halves of each driver: the code to write isn’t in its package. A test on every release sends it every kind of write and passes only if each is refused and the machine received reads only. Its read-only statement is generated from that code and ships inside the package.

Outcome Your security team signs off a program, not a promise.
Factory program · writes
refused4 write attemptseach refused; the machines received reads onlyrun

From the demo run. 4 write attempts, one per protocol, every one refused by the factory program.

2The scene

From the record.

A line is its machines in flow order, the buffers between them, the bottleneck you named, and the shift they run in. On Line 1, CELL-4 Machining Cell stopped 4 min; the operator entered technical / Spindle drive fault at 00:38:52, on the phone. The machines behind it — PRESS-5 Press — were starved, each derived from the line’s flow. The shift’s OEE was 41.9 % (A 42.9 · P 100 · Q 97.8); the line’s figure is its bottleneck’s, the machine a person named. CNC-1 Mill’s bearing read 0.28 mm/s RMS — a reading, not yet judged. 4 write attempts, one per protocol, every one refused by the factory program.

CNC-1 Mill · vibration
CNC-1 Mill’s vibration panel: the sensor, its features and the spindle band against its usual, labelled demo history.
From a demo run: CNC-1 Mill’s vibration panel: each band against its usual, from demo history.
3The four questions

What you actually want to know.

Do I have to install anything?

No. We run HOLOIN for you on a dedicated server in the country you choose, never shared with another company, and you can take it with you. If you have your own servers, install it there instead; same product.

You supply one Linux server with Docker, a place on the plant network for the factory program, connecting out, and the ports your IT opens — the install guide lists them. One install bundle carries what a plant needs.

What do I need?

Machines that speak one of the protocols the factory program reads, or a retrofit kit for one that doesn’t; a place on the plant network for the factory program, connecting out. The install guide lists the ports.

What does it cost?

Per installation, per year, by device tier: from US$15,000 a year for the platform and Smart Factory, up to 100 devices. The whole grid is on Pricing. No per-seat fees; every operator and supervisor is included.

Who do I call?

Hours, channel and response time: on request. Every installation can produce a support bundle on demand, a readable archive with no personal data or secrets, which your IT team can check before it goes to us.

4Day one

The factory program goes on your plant network and connects out; the line appears. Name the bottleneck, set the stop threshold, and keep the sub-reasons you own.

  • No command to a machine, ever: the factory module has no command type at all, and the factory program has no write primitive on any protocol.
  • The factory program connects out to your installation; nothing connects in. Readings wait on its disk while the link is down and arrive in order, nothing lost.
  • Keep the PLC’s own write protection on: it stays the authoritative control.
  • Not an MES: orders and shifts come from your MES or ERP, or are entered; HOLOIN schedules nothing.
  • A bearing rising against its own normal is a recommendation to inspect it, with the trend; never a zone before the standard is verified.
  • The bottleneck, named by a person, and a recommendation when another machine limited the line more this week.
  • A standard that’s too loose: a machine running faster than its standard on three of five shifts is a recommendation, with the standard cited.